MANY SATISFIED SINGAPORE MANAGEMENT CORPORATION STRATA TITLE (MCST) CUSTOMERS AND PRIVATE PROPERTY OWNERS VALUE OUR ONE-STOP RELIABLE, PROMPT AND QUALITY SERVICE FOR VARIED REPAIRS, REFURBISHMENT, RENOVATION & MAINTENANCE PROJECTS AND HANDYMAN JOBS AT THEIR RESIDENCES, SHOPS AND OFFICES.
Please refer to our MCST Project References
PROJECTS’ REFERENCES FOR YEAR 2013
NO |
PERIOD |
MCST PLAN NO. |
MANAGING AGENT
|
CONDO/BUILDING |
SCOPE OF WORKS |
1 |
DEC |
Private Owner | Euphony Gardens | Supply & Install wooden trellis at roof-top balcony | |
2 |
DEC |
Private Owner | North Bridge Rd HDB | Toilet floor & wall retiling, sliding door replacement. | |
3 |
DEC |
Private Owner | Sunshine Plaza | Touch-up painting of whole unitReplace damaged floor laminate | |
4 |
DEC |
2748 |
Knight Frank | Queens Condo | Supply of granite tiles |
5 |
DEC |
1267 |
Knight Frank | Yong An Park | Pump room door replacement |
6 |
DEC |
2230 |
Knight Frank | Valley Park | Construction of drain access |
7 |
DEC |
2230 |
Knight Frank | Valley Park | Painting of road signages |
8 |
DEC |
Far East | West Coast Plaza | Supply & install laminate for pillars | |
9 |
DEC |
3137 |
Newman & Goh | 8@Tradehub 21 | Damaged ceiling & flooring restoration @ ground floor unit |
10 |
DEC |
2748 |
Knight Frank | Queens Condo | Supply of flamed granite |
11 |
NOV |
1634 |
HBA | Henderson Ind Bldg | Repair of urinal pipe at toilets |
12 |
NOV |
2112 |
Chambers | Chiltern Park | Repair of sunken areas in 5 ICs |
13 |
NOV |
1267 |
Knight Frank | Yong An Park | Replacement of existing Pump Room door to PVC door |
14 |
NOV |
Self Managed | Ridgewood Condo | Repair of BBQ pit | |
15 |
NOV |
Self Managed | Ridgewood Condo | Fabricate & Supply of SS BBQ trays & charcoal holders | |
16 |
NOV |
2824 |
Stature | Decosia | Replacement of wooden roof tiles for pavilions |
17 |
NOV |
2824 |
Stature | Decosia | Fabrication & Supply of S.S. BBQ trays & grilles |
18 |
NOV |
2824 |
Stature | Decosia | Repair of BBQ pit |
19 |
NOV |
1882 |
Sunprop | Ava Tower | Reinstatement of roof tiles and repair leakages |
20 |
NOV |
1584 |
Savills Ppty Mgt | Flame Tree Park | Replacement of slate tiles |
21 |
OCT |
2112 |
Chambers | Chiltern Park | CCTV Survey |
22 |
OCT |
3342 |
Raffles Strata Mgt Pte Ltd | City Edge | Replacement of tiles at shower area of poolside |
23 |
OCT |
1584 |
Savills Ppty Mgt | Flame Tree Park | Reconstruction of fencing wall |
24 |
OCT |
Far East | West Coast Plaza | Supply & install picket fences | |
25 |
OCT |
Private Owner | Urbana | Repair works at toilet at unit | |
26 |
OCT |
Private Owner | Urbana | Retiling work at kitchen vanity top | |
27 |
OCT |
Private Owner | Urbana | Replacement of laminate for TV console and cabinet | |
28 |
OCT |
1267 |
Knight Frank | Yong An Park | Relocation of lights at driveway |
29 |
OCT |
1267 |
Knight Frank | Yong An Park | Supply & install convex mirror near side gate |
30 |
OCT |
1267 |
Knight Frank | Yong An Park | Wiring of bollard to junction box |
31 |
OCT |
3897 |
DTZ | Waterfront Waves | Rectification of damaged kerb at carpark |
32 |
SEP |
2230 |
Knight Frank | Valley Park | Sunken carpark Rectification |
33 |
SEP |
1267 |
Knight Frank | Yong An Park | Fabricate and install wire mesh at basketball court |
34 |
SEP |
1267 |
Knight Frank | Yong An Park | Repair wire mesh at basketball court |
35 |
SEP |
1267 |
Knight Frank | Yong An Park | Replacement of damaged waterpipe replacement |
36 |
SEP |
1267 |
Knight Frank | Yong An Park | Garden light installation |
36 |
AUG |
1267 |
Knight Frank | Yong An Park | Repair of leakage & grouting at carpark lot |
36 |
AUG |
Far East | West Coast Plaza | Replace damaged laminate at lift lobby | |
37 |
AUG |
2243 |
HBA | Jervois Lodge | Construction of metal standing platforms |
38 |
AUG |
1267 |
Knight Frank | Yong An Park | Supply & Installation of convex mirrors & traffic bollards |
39 |
AUG |
2112 |
Ace Body | Chiltern Park | Repair of leakages in sewerage pipes |
40 |
JUL |
Private Owner | North Bridge Rd HDB | Repairs & Repainting of interior and gate of shop unit | |
41 |
JUL |
1995 |
Jones Lang | Central Green | Repair of swing at Children’s Playground |
42 |
JUL |
2405 |
Barringham | Kentish Lodge | Supply & Installation of stainless steel BBQ trays |
43 |
JUL |
2405 |
Barringham | Kentish Lodge | Reconstruction of BBQ area |
44 |
JUL |
2405 |
Barringham | Kentish Lodge | Supply and Install of polycarbonate shelter for BBQ area |
45 |
JUL |
2405 |
Barringham | Kentish Lodge | Fabricate and supply BBQ trays |
46 |
JUL |
1267 |
Knight Frank | Yong An Park | Repair of Wall and Floor of Basketball Court |
47 |
JUL |
3634 |
DTZ | Dakota Residences | Supply & Install retractable fabric awning @ Guard Hse |
48 |
JUN |
1267 |
Knight Frank | Yong An Park | Supply Installation of auto sliding gate and swing gate |
49 |
JUN |
1551 |
Total Estate | Buona Vista Gardens | Construction of drain pipes along walkway |
50 |
JUN |
Far East | West Coast Plaza | Repair of pipe holes | |
51 |
JUN |
Far East | West Coast Plaza | Expansion joint rectification | |
52 |
JUN |
Far East | West Coast Plaza | Patching of holes on floor | |
53 |
JUN |
Far East | West Coast Plaza | Conversion of sitting area to barber kiosk | |
54 |
JUN |
2112 |
Ace Body | Chiltern Park | Repair of cracked Inspection Chambers |
55 |
MAY |
Far East | West Coast Plaza | Repair of potholes along driveway | |
56 |
MAY |
Far East | West Coast Plaza | Repair of false ceiling | |
57 |
MAY |
Far East | West Coast Plaza | Repair of wall at carpark entrance | |
58 |
MAY |
1551 |
Total Estate | Buona Vista Gardens | Retiling of walkway round estate |
59 |
MAY |
2432 |
Westmere Condo | Dismantling of guard house shelter | |
60 |
MAY |
3137 |
Newman & Goh | 8@Tradehub 21 | Cement slab repair |
61 |
MAY |
2243 |
HBA | Jervois Lodge | Fabricate & Install of External & Internal aircon risers |
62 |
MAY |
2243 |
HBA | Jervois Lodge | Access hole openings and cable trays installation |
63 |
MAY |
2243 |
HBA | Jervois Lodge | Construction of additional bridging at rooftops |
64 |
APR |
2118 |
Iland | Second Ave Junction | Replacement of wooden riser doors |
65 |
APR |
3634 |
DTZ | Dakota Residences | Supply & Installation of stainless steel bicycle racks |
66 |
APR |
3634 |
DTZ | Dakota Residences | Supply & Installation of stainless steel handrail at staircase @ Management Office |
67 |
APR |
1995 |
JLL | Central Green | Supply & Installation of wooden toilet door |
68 |
APR |
2479 |
Propnex | Westcove Condo | Supply & Installation of new wooden rail at bridge |
69 |
MAR |
2479 |
Propnex | Westcove Condo | Replacement of chengai pole for wooden bridge |
70 |
MAR |
3634 |
DTZ | Dakota Residences | Reconstruction of concrete slab at Guard House |
71 |
MAR |
1479 |
DicksonProperty | Upper Serangoon Shopping Centre | Repair of cracks at cooling tower |
72 |
MAR |
1479 |
DicksonProperty | Upper Serangoon Shopping Centre | Replace of wooden doors with UPVC doors at roof top motor room and cooling tower |
73 |
MAR |
2288 |
Iland | Landbay | Closing of OpenNet ceiling with permanent access panels |
74 |
MAR |
2932 |
Total Estate | Fortune Jade | Replacement of door closer |
75 |
MAR |
2932 |
Total Estate | Fortune Jade | Revarnishing of door |
76 |
FEB |
1995 |
JLL | Central Green | Emergency repair of damaged underground pipes |
77 |
FEB |
1882 |
Ace Body | Ava Tower | Repair of surfaced drain at playground |
78 |
FEB |
2805 |
Hilandas | The Belleforte | Conversion of Fish Pond to Staircase |
79 |
FEB |
2805 |
Private Owner | The Belleforte | Replacement of water tank heater |
80 |
FEB |
3386 |
Knight Frank | Citylights | Engagement of P.E. Services for Repair of Drain Gutters |
81 |
FEB |
2479 |
Propnex | Westcove Condo | Replacement of damaged swimming pool tiles |
82 |
FEB |
2850 |
Hilandas | The Sunshine | Paving blocks replacement |
83 |
FEB |
2479 |
Propnex | Westcove Condo | Repair of golf putting area |
84 |
FEB |
2016 |
Total Estate | Avila Gardens | Strengthening of Tennis Court Nettings |
85 |
JAN |
3634 |
DTZ | Dakota Residences | Change of Booster for CCTV |
86 |
JAN |
Ace Body | Tresalveo | Cleaning and Sterilization of water tanks | |
87 |
JAN |
3199 |
Total Estate | Grosvenor View | Supply & Installation of wooden door for toilet |
88 |
JAN |
1995 |
JLL | Central Green | Repair of ceiling for Blk 5 12th floor |
89 |
JAN |
837 |
Total Estate | Everich Industrial Building | Repair of damaged drain and weld new grating support |
90 |
JAN |
3137 |
Newman & Goh | 8@Tradehub 21 | Repair of railings at loading and unloading bay |
91 |
JAN |
2500 |
Newman & Goh | Estella Gardens Condo | Diversion of Bin Chute Switch |
92 |
JAN |
2348 |
Exceltec | MaySprings | Downpipes & gutter Repair |